Like most websites Air Forces Monthly uses cookies. We use cookies to ensure that we give you the best experience on our website. If you continue without changing your settings, we'll assume that you are happy to receive all cookies on Air Forces Monthly website. However, if you would like to, you can change your cookie settings at any time. Find out more

Continue

US Navy Signs deal for additional P-8As

 

The Navy has signed a $2 Billion order with Boeing for 13 P-8A Poseidon aircraft.

The contract includes long-lead funding previously approved by the Navy.

The aircraft will be used for the continued modernisation of the U.S. maritime patrol fleet that will ultimately involve more than 100 P-8As, replacing the Navy’s current P-3 aircraft.

In total, the Navy has now ordered 37 of the 117 P-8As it is expected to purchase and to date, 10 have been delivered. The P-8As are based on the Next-Generation 737-800 commercial aircraft and will be used to provide anti-submarine, anti-surface warfare as well as intelligence, surveillance and reconnaissance capabilities.

Boeing assembles P-8As in the same facility where it builds all its 737s and the Poseidon team uses in-line processes that takes advantage of the efficiencies in the Next-Generation 737 production system. After initial assembly, the aircraft enter a separate mission system installation and checkout facility for final modifications and testing.

Initial operational test and evaluation (IOT&E) was completed in March; the Navy announced July 1 that the P-8A program had passed IOT&E and the P-8A was ready for fleet introduction.

Posted in News

NEVER MISS AN ISSUE...

Our Instant Issue Service sends you an email whenever a new issue of Air Forces Monthly is out. SAVE ON QUEUES - FREE P&P